Corrections

Briefs are reprinted, never overwritten; GPS pages are corrected in place.

Named parties and readers may send corrections to corrections@strature.net. We correct a brief in a new edition or a dated reprint, and a GPS page in place, and list every correction and reissue below.

The policy

A corrected edition, with the old one kept on record.

  1. 1

    Anyone may write.

    A party named in a publication, or any reader, may send a correction to corrections@strature.net, with the passage and the source that shows the error.

  2. 2

    Two kinds of change.

    A correction fixes a fact that was wrong. A reissue fixes no wrong fact: it changes the format, charts, notices or terms, or brings dated facts up to date.

  3. 3

    A new edition or a dated reprint.

    Either kind raises the minor edition, from 1.0 to 1.1; a rebuild raises the major edition. A small change may instead be a dated reprint of the same edition, which says on its own pages what changed.

  4. 4

    Every change is printed and listed.

    The text is not silently replaced. Each correction and reissue is listed in the log below, dated, with what changed.

  5. 5

    The earlier edition stays on record.

    A superseded edition published here stays in the Strature Briefs catalogue, marked superseded. One exception: C-006 Edition 1.5 was taken off the site when Edition 1.6 replaced it on 6 Oct 2026; it is kept on record and listed below.

  6. 6

    GPS pages are corrected in place: the corrected item shows the date, and each correction of a published figure, reading or forecast box is listed below.

Change log

Every correction and reissue, dated.

Each row gives the date, the kind of change, the publication, the edition and what changed. Rows are added, never removed. C-006 Editions 1.0 to 1.4 were made and replaced before any was published here; they are listed so that the edition numbers add up. Briefs released on 30 Sep 2026 were first written as source editions; where the release found a source fact wrong, the brief says so in its “Since publication” note, and the correction is listed here.

Change log of corrections and reissues of Strature publications
DateKindPublicationEditionWhat changed
Date: 21 Oct 2026Kind: CorrectionPublication: Strature GPS: The full network map: every good, nine straits and fourteen scenariosEdition: Live page, corrected in placeWhat changed: War-risk insurance quotes were rounded to whole numbers, so small quotes showed as 0%. They now show as published, for example the Howden Re quote for February 2026, before 28 Feb 2026: 0.100–0.125%. Was 0%; now 0.100–0.125%. A display-rounding error cut the decimals of small quotes. The published quotes did not change. Source: Howden Re: Strait of Hormuz report (March 2026), pp. 10-13.
Date: 21 Oct 2026Kind: CorrectionPublication: Strature GPS: Scenarios: what if a strait closes?Edition: Live page, corrected in placeWhat changed: War-risk insurance quotes were rounded to whole numbers, so small quotes showed as 0%. They now show as published, for example the Howden Re quote for February 2026, before 28 Feb 2026: 0.100–0.125%. Was 0%; now 0.100–0.125%. A display-rounding error cut the decimals of small quotes. The published quotes did not change. Source: Howden Re: Strait of Hormuz report (March 2026), pp. 10-13.
Date: 21 Oct 2026Kind: CorrectionPublication: Strature GPS: Strait of Hormuz closed, restricted or unsafe: a scenarioEdition: Live page, corrected in placeWhat changed: The Red Sea line's −70% transit figure is unchanged. Its label now names the Suez Canal, not Bab el-Mandeb. Its source is now UNCTAD, not PortWatch. Was Houthi attacks from Nov 2023; Bab el-Mandeb transits -70% vs Dec 2023 by spring 2024; rerouting via Cape (+10-15 days); now Red Sea disruption from Nov 2023 (as reported); Suez Canal transits −70% in June 2024 against mid-December 2023 (UNCTAD, Review of Maritime Transport 2024); ships rerouted via the Cape of Good Hope (+10–15 days). The −70% figure counts Suez Canal transits in June 2024 against mid-December 2023. The old line named the wrong waterway and the wrong source. Source: UNCTAD, Review of Maritime Transport 2024.
Date: 5 Oct 2026Kind: ReissuePublication: C-006 Canada: Access by ListEdition: 1.6, replacing 1.5What changed: Charts redrawn in the house format, with a Contents page, numbered exhibits and each source given once as a caption; the Statistics Canada licence notice added to ten more charts; internal labels removed; past calendar rows marked with their status. No probability, call or scenario changed. On this site from 6 Oct 2026.
Date: 5 Oct 2026Kind: ReissuePublication: C-006 Canada: Access by ListEdition: 1.5, replacing 1.4What changed: The front summary describes the highest risks instead of telling readers what to act on first; the licence credit its figures require is added; the notice and terms use free-use wording. The first edition published on this site.
Date: 4 Oct 2026Kind: ReissuePublication: C-006 Canada: Access by ListEdition: 1.4, replacing 1.3What changed: Adds an exposure radar and a likelihood-and-harm map at the front, and a “What changed in this edition” note. Not published on this site.
Date: 4 Oct 2026Kind: ReissuePublication: C-006 Canada: Access by ListEdition: 1.3, replacing 1.2What changed: Layout faults fixed: cut-off running heads, dates wrapping in narrow columns, footers pointing to the wrong notice, and a reference to an unnamed page; one scenario title reworded. Not published on this site.
Date: 4 Oct 2026Kind: CorrectionPublication: C-006 Canada: Access by ListEdition: 1.2, replacing 1.0 and 1.1What changed: Editions 1.0 and 1.1 printed the wrong catalogue number, Country Outlook No. 001; Edition 1.2 prints No. 006. It also adds the options notice to the Notice page and the brand mark to every page. The wrong number was never published on this site.
Date: 2 Oct 2026Kind: ReissuePublication: Q-021 Can Canada turn promised capital into built projects?Edition: 1.1, replacing 1.0What changed: Moved to the house format, with contact details, terms and a legal re-check. “Since publication” and the signposts are updated for an order made on 1 Oct 2026 (P.C. 2026-0925) listing the West Coast Oil Pipeline. No forecast changed. Edition 1.0 stays listed, marked superseded.
Date: 2 Oct 2026Kind: ReissuePublication: Q-024 Canada–US trade: who is exposedEdition: 1.0, dated reprintWhat changed: Contact details and notices updated: the summary sheet’s “The call” reads “The answer”; a line says no forecast is registered in this edition; the track-record line links the public forecast register. No finding or figure changed.
Date: 2 Oct 2026Kind: ReissuePublication: C-001, C-002, C-003, C-004, Q-021 (1.1), Q-023, S-001, T-001, T-002, T-003, X-001Edition: Same editions, dated reprintsWhat changed: Contact, corrections and register lines moved to this site’s new address; each reprint says “Reprinted 2 October 2026: contact details updated”. No content changed.
Date: 1 Oct 2026Kind: ReissuePublication: C-006 Canada: Access by ListEdition: 1.1, beside 1.0What changed: A visual edition: 18 exhibits redrawn and 5 added, every number from the same sources; new terms. Not published on this site.
Date: 30 Sep 2026Kind: CorrectionPublication: T-001 Can Canada become a material energy supplier beyond the United States?Edition: 1.0, correcting its source editionWhat changed: The non-US gas column of Statistics Canada table 25-10-0086 is blank for 114 months before July 2025, not 48. The regulator also lists 10 small LNG export records to China from three other British Columbia points, so nearly all, not all, of the non-US gas trade ran through one terminal.
Date: 30 Sep 2026Kind: CorrectionPublication: T-002 Is the Northwest Passage becoming a shipping lane?Edition: 1.0, correcting its source editionWhat changed: The publisher’s seven route groups and three composite courses sum to its total of 465; there is no three-transit gap in its arithmetic. Its per-season summaries also sum to 465, not 466, and its 2018, 2020 and 2021 annotations are in the text, not only in a graphic.
Date: 30 Sep 2026Kind: CorrectionPublication: T-003 Was the Strait of Hormuz closed, or repriced cargo by cargo?Edition: 1.0, correcting its source editionWhat changed: Five facts corrected: the wording on monetizing the Strait is in the US Treasury release of 29 July 2026, not Federal Register rule 2026-17426; the July war-risk range is credited to S&P Global, not Marsh; 21 further IEA members, not seven, supplied the rest of the 426 million barrels, and the US insurance offer came on 3 March; Frontline’s quarter was its best ever, not since 2004, Strait flows were 21.6 million barrels a day in the fourth quarter of 2025, and EIA’s supplement is dated 12 August; the owners’ refusal sits in sub-clause (b) of the war clause, not (f).
Date: 30 Sep 2026Kind: CorrectionPublication: X-001 TSMC’s geopolitical exposure sits on one island, not in its China salesEdition: 1.0, correcting its source editionWhat changed: Arizona’s first facility entered high-volume production at the end of 2024, not in 2025; Taiwan listed Huawei and SMIC in June 2025, not June 2026; EMEA was 3% of 2025 revenue, not 4%; the US footprint also includes Fab 11 in Washington State.
Date: 30 Sep 2026Kind: CorrectionPublication: S-001 Iran, the Strait of Hormuz, and a renewed strikeEdition: 1.0, correcting its source editionWhat changed: Four retrieval marks printed on the source’s own registers are replaced by the real date of a fresh retrieval, or marked not disclosed. See annex 1 of the full brief.
Date: 30 Sep 2026Kind: CorrectionPublication: Q-026 What can a large electricity load get connected in Canada, where, and by when?Edition: 1.0, in its “Since publication” noteWhat changed: The close to 800 MW requested was described as spread across all three categories; the Province places the first call with AI and data centres, and hydrogen for export has its own later call. The comparison of 400 MW with close to 800 MW stands.
Date: 7 Aug 2026Kind: CorrectionPublication: C-002 Is any single future for Iran likely?Edition: Forecast register, before Edition 1.0What changed: An odds-ceiling correction in the forecast register: F-0020 and F-0021 superseded F-0007 and F-0012, 15.1% to 13.74% and 5.3% to 4.16%. The originals stay sealed and are scored.
Get in touch

Tell us the decision you are facing.

The Principal reads every message and replies from the firm’s own address. Your message is never added to a mailing list unless you tick the box to be kept informed. No tracking of people: we count visits and downloads without cookies.