World risk · Energy and resources

The Greater Sunrise gas contracts are still unsigned on 30 Jun 2027

The test By 30 Jun 2027, not all three instruments for Greater Sunrise (the Petroleum Mining Code, the production sharing contract and the fiscal regime) are signed.

Not under way · Confidence: medium · Reviewed 1 Nov 2026 · Scores from 1 to 10

This page answers: What could happen, how it is scored, and who is exposed?

Using this page
  1. Read the two scores: Likelihood and Impact are kept apart.
  2. Check what is happening, each fact with its source.
  3. Use the calendar for the dates to watch.

Follow this riskSign in to follow; one weekly email if you ask for it.

Likelihood
5Elevated steady this month
Impact
4Elevated steady this month
Breadth4
Depth2
Duration4
Hard to substitute4
Canada pointNot added0

Impact is the average of the four parts, rounded, plus one point when Canada is directly hit on two or more channels, up to 10.

Two separate scales from 1 to 10. Strature never multiplies or merges them.

What changed

Dated, newest first

  1. Ramos-Horta (about 18 Oct 2026): agreements could be signed within months, first early 2027; Woodside selling 33.44% to Timor GAP; Osaka Gas selling 10%; January 2026 New Partnership for a New Era; analysts judge Chinese finance unlikely [1]
  2. Woodside to sell 33.44% for up to US$200m (US$13.71m at completion, US$11.29m after FID, US$175m after first LNG); completion expected 1H 2027; August 2026 alignment on key principles for a new PSC and fiscal framework [4]

Why it matters

Timor-Leste and Australia finalised the Petroleum Mining Code for Greater Sunrise in spring 2026, but the production sharing contract and fiscal regime are still open. President Ramos-Horta said in October they could be signed within months. The state firm Timor GAP is now buying out its partners and must find the money itself.

Why Likelihood 5 Pushes: partners' exit leaves Timor GAP to find finance; analysts judge Chinese finance unlikely. Brakes: Mining Code finalised; the President's within-months aim. One source each side: an open contest.

Why Impact 4 Threshold case a slip of weeks to months.

The other facts on file (2)
  • Petroleum Fund could run out by 2034 (government); balance US$18.6bn; petroleum revenue US$36m in 2025; Chinese state firms may join after the framework with Australia is final [2] (9 Jun 2026)
  • Petroleum Mining Code finalised; PSC and fiscal regime talks at an advanced stage; rounds set for June 2026 [3] (17 Apr 2026)

Where it sits

Exhibit R-1 · Map

Where this risk sits

Size shows Impact. Colour shows the Likelihood band. The two scores are never combined.

The Greater Sunrise gas contracts are still unsigned on 30 Jun 2027. Impact 4 of 10, Elevated. Likelihood 5 of 10, Elevated.
  • Low 1–3
  • Elevated 4–6
  • High 7–8
  • Severe 9–10
  • Bigger circle: higher Impact
  • Solid ring: under way
  • Red ring: highest Impact on this map
  • Where it starts
  • Who it reaches

The risk on this map

  1. The Greater Sunrise gas contracts are still unsigned on 30 Jun 2027Impact 4 of 10, Elevated. Likelihood 5 of 10, Elevated. · East Timor
SourceStrature world-risk cards. Cards reviewed 1 Nov 2026. Map: Natural Earth 1:110m, Equal Earth projection. Country names imply no position on sovereignty.
Exhibit R-1 · EAST TIMOR · strature.net

How it spreads

If

By 30 Jun 2027, not all three instruments for Greater Sunrise (the Petroleum Mining Code, the production sharing contract and the fiscal regime) are signed.

Not under way

Channels 4 on the card

  1. CanadaNo Canadian loss sourced.
  2. Timor-Leste's budgetEach delay pushes back the gas revenue the Petroleum Fund needs.
  3. InvestorsWithout a signed regime Timor GAP cannot bring in partners and finance.
  4. AustraliaA slip tests the January 2026 partnership [1].

Goods 1

Sectors 1

  • Energy and pipelines

Countries 2

Who is exposed

Countries
East Timor, Australia
Sectors
Energy and pipelines
Goods
LNG
Companies
Timor GAP, Woodside, Osaka Gas

Three scenarios and their signposts

  1. S1

    Signed on time

    The PSC and fiscal regime are signed in early 2027.

  2. S2

    Partial

    One instrument is signed, one is not.

  3. S3

    Stall

    Financing and partner talks delay the texts.

The signposts of each scenario
PathSignpost
S1A signing ceremony in Dili or Canberra
S2A first signing early in 2027 alone
S3No new talks round reported by March 2027

No probability is given for the three paths.

Dates to watch

Calendar

The dates to watch

A dot is a day, a bar a month or a year; a hollow mark is tentative. The line marks today.

  1. Jan 2027 First agreement expected early 2027 (Ramos-Horta) [1] Tentative · Outside event
  2. Jun 2027 Woodside sale completion expected in the first half of 2027 [4] Tentative · Outside event
  3. 30 Jun 2027 Date on which this event is judged [3] Declared · Strature date

    Remind me

Sign in, with alerts on, for an email 7 days and 1 day before.

SourceStrature world-risk card; the dates cite the sources below.
Exhibit R-3 · EAST TIMOR · strature.net

The other side

Full state ownership lets Timor-Leste choose a pipeline to its own coast, which under the 2018 treaty would raise its revenue share (Strature's view); a signed regime would open the door to new partners [2].

Connected in Strature

Sources

4 sources, numbered as the text cites them

  1. Greater Sunrise: the questions Woodside's exit leaves unanswered. Lowy Institute, The Interpreter · 28 Oct 2026 · Think tank · confidence medium · retrieved 1 Nov 2026
  2. Interview with Minister for Petroleum and Mineral Resources Francisco Monteiro (Lusa). AMAN Alliance (Lusa) · 9 Jun 2026 · News · confidence medium · retrieved 1 Nov 2026
  3. Greater Sunrise negotiations advance with focus on finalizing production sharing contract and fiscal regime. Tatoli · 17 Apr 2026 · News · confidence medium · retrieved 1 Nov 2026
  4. Woodside agrees to sell Greater Sunrise stake to TIMOR GAP for up to $200M. Offshore Engineer (OEDigital) · 27 Oct 2026 · Industry · confidence medium · retrieved 1 Nov 2026

Reviewed 1 Nov 2026 · version 1 · last change: first review · All risks