World risk · Energy and resources

Drought at Lake Kariba brings 12-hour daily power cuts back to Zambia and Zimbabwe

The test Between 1 Nov 2026 and 1 Nov 2027, ZESCO (Zambia) or ZESA/ZETDC (Zimbabwe) runs household load-shedding of 12 hours a day or more for at least 30 days in a row, as announced by the utility or the energy regulator.

Not under way · Confidence: medium · Reviewed 1 Nov 2026 · Scores from 1 to 10

This page answers: What could happen, how it is scored, and who is exposed?

Using this page
  1. Read the two scores: Likelihood and Impact are kept apart.
  2. Check what is happening, each fact with its source.
  3. Use the calendar for the dates to watch.

Follow this riskSign in to follow; one weekly email if you ask for it.

Likelihood
4Elevated rising this month

Likelihood ↑ Up since 15 Oct 2026: the Zambezi River Authority cut the 2027 Kariba power allocation.

Impact
5Elevated steady this month
Breadth5
Depth3
Duration5
Hard to substitute6
Canada pointNot added0

Impact is the average of the four parts, rounded, plus one point when Canada is directly hit on two or more channels, up to 10.

Two separate scales from 1 to 10. Strature never multiplies or merges them.

What changed

Dated, newest first

  1. Likelihood 5 to 4.
  2. 2027 Kariba allocation 23 bn m3 (11.5 each), down from 36 bn m3 in 2026, on forecasts of strong El Nino and below-normal rain [1]
  3. Usable storage 23.77 bn m3 (36.68%) on 14 Oct 2026, against 8.25 bn m3 (12.75%) a year earlier; projected 5.83 bn m3 by 31 Dec 2027 [1]
  4. WMO expects a very strong El Nino into early 2027 [2]

Why it matters

On 15 Oct 2026 the Zambezi River Authority cut the water Zambia and Zimbabwe may use at Kariba in 2027 to 23 bn m3, from 36 bn m3, citing a strong El Nino. Both countries ran long daily cuts in the last drought. Before the cut, in May and June 2026, both utilities said long cuts were over, citing added thermal and solar capacity and imports.

Why Likelihood 4 Pushes: the allocation cut, ZRA's projected fall in storage to about a tenth of live storage by end-2027, the El Nino forecast. Brakes: both utilities' heads said in May and June 2026 that long cuts are over; storage is higher than a year ago.

Why Impact 5 Threshold: 12-hour cuts for 30 days.

The other facts on file (3)
  • Zimbabwe load-shedding of up to 16 hours a day [3] (23 May 2025)
  • Open Zambia: ZESCO does not expect to return to nationwide load management [4] (10 Jun 2026)
  • ZESA CEO: load-shedding to end by December 2026; 138 days without it; power imported from Mozambique [5] (11 May 2026)

Where it sits

Exhibit R-1 · Map

Where this risk sits

Size shows Impact. Colour shows the Likelihood band. The two scores are never combined.

Drought at Lake Kariba brings 12-hour daily power cuts back to Zambia and Zimbabwe. Impact 5 of 10, Elevated. Likelihood 4 of 10, Elevated.
  • Low 1–3
  • Elevated 4–6
  • High 7–8
  • Severe 9–10
  • Bigger circle: higher Impact
  • Solid ring: under way
  • Red ring: highest Impact on this map
  • Where it starts
  • Who it reaches

The risk on this map

  1. Drought at Lake Kariba brings 12-hour daily power cuts back to Zambia and ZimbabweImpact 5 of 10, Elevated. Likelihood 4 of 10, Elevated. · Zambia
SourceStrature world-risk cards. Cards reviewed 1 Nov 2026. Map: Natural Earth 1:110m, Equal Earth projection. Country names imply no position on sovereignty.
Exhibit R-1 · WORLD · strature.net

How it spreads

If

Between 1 Nov 2026 and 1 Nov 2027, ZESCO (Zambia) or ZESA/ZETDC (Zimbabwe) runs household load-shedding of 12 hours a day or more for at least 30 days in a row, as announced by the utility or the energy regulator.

Not under way

Channels 4 on the card

  1. CanadaNo Canadian loss sourced.
  2. MiningCopperbelt mines draw on the same grid (Strature's view).
  3. Households and firmsLong daily cuts hit small firms, water pumping and cold chains (Strature's view).
  4. BudgetsPower imports cost foreign exchange; Zimbabwe already imports from Mozambique [5].

Goods 2

  • Electricity
  • Copper

Sectors 2

  • Mining and metals
  • Energy and pipelines

Countries 2

Who is exposed

Countries
Zambia, Zimbabwe
Sectors
Mining and metals, Energy and pipelines, Agriculture and food
Goods
Electricity, Copper

Three scenarios and their signposts

  1. S1

    Managed

    Thermal, solar and imports cover the gap; cuts stay short.

  2. S2

    Rationed

    Cuts of 8-10 hours return in the dry season.

  3. S3

    Back to 12 hours

    A failed rainy season forces long daily cuts.

The signposts of each scenario
PathSignpost
S1ZESCO and ZESA schedules in the first quarter of 2027
S2The lake level at the end of the rains, about May 2027
S3A ZRA mid-year review cutting the allocation again, about mid-2027

No probability is given for the three paths.

Dates to watch

Calendar

The dates to watch

A dot is a day, a bar a month or a year; a hollow mark is tentative. The line marks today.

  1. 1 Jan 2027 2027 Kariba allocation of 23 bn m3 takes effect [1] Declared · Outside event

    Remind me

  2. May 2027 End of the rainy season: lake inflow known [1] Tentative · Window
  3. 1 Nov 2027 End of the scored window [1] Declared · Strature date

    Remind me

Sign in, with alerts on, for an email 7 days and 1 day before.

SourceStrature world-risk card; the dates cite the sources below.
Exhibit R-3 · WORLD · strature.net

The other side

Storage starts 2027 far higher than a year earlier [1], and the new capacity both utilities cite could make this the first El Nino without long cuts [4][5].

Connected in Strature

Sources

5 sources, numbered as the text cites them

  1. ZRA slashes Kariba water allocation for 2027. The Herald (Zimbabwe) · 15 Oct 2026 · News · confidence medium · retrieved 1 Nov 2026
  2. El Nino set to become very strong, raising risks of extreme weather into 2027. World Meteorological Organization · 3 Sep 2026 · International body · confidence high · retrieved 1 Nov 2026
  3. No end in sight to the electricity crisis. NewsDay (Zimbabwe) · 23 May 2025 · News · confidence medium · retrieved 1 Nov 2026
  4. ZESCO: No Return to Nationwide Load Shedding. Open Zambia · 10 Jun 2026 · News · confidence medium · retrieved 1 Nov 2026
  5. Zimbabwe: 'No More Electricity Load Shedding Beyond 2026', Says Zesa Group CEO. AllAfrica (New Zimbabwe) · 11 May 2026 · News · confidence medium · retrieved 1 Nov 2026

Reviewed 1 Nov 2026 · version 1 · last change: Likelihood 5 to 4 · All risks