TAPI gas does not reach Herat by end-October 2027

The test By 31 Oct 2027, no Turkmen gas has flowed through the TAPI pipeline to Herat, as stated by the Turkmen or Afghan government.

Not under way · Confidence: medium · Reviewed 1 Nov 2026 · Scores from 1 to 10

This page answers: What could happen, how it is scored, and who is exposed?

Using this page
  1. Read the two scores: Likelihood and Impact are kept apart.
  2. Check what is happening, each fact with its source.
  3. Use the calendar for the dates to watch.

Follow this riskSign in to follow; one weekly email if you ask for it.

Likelihood
4Elevated steady this month
Impact
3Low steady this month
Breadth4
Depth1
Duration4
Hard to substitute4
Canada pointNot added0

Impact is the average of the four parts, rounded, plus one point when Canada is directly hit on two or more channels, up to 10.

Two separate scales from 1 to 10. Strature never multiplies or merges them.

What changed

Dated, newest first

  1. Herat section about 80% complete; pipe welded on 124 km; hydrostatic testing; commissioning aimed by end-2026; legal and commercial framework with Afghan partners still to finish [1]
  2. Turkmengaz: Herat section by end-2026; leg towards Pakistan the 2027 priority; no date for gas to South Asia [2]

Why it matters

The first leg of the TAPI pipeline, from the Turkmen border to Herat, was about 80% complete in October 2026, and Turkmen officials aim to commission it by the end of 2026. Price, volumes and a Herat distribution network are still open. The risk is that no Turkmen gas flows to Herat by end-October 2027.

Why Likelihood 4 Pushes: open price, volume and legal framework; no Herat distribution network; no supply date. Brake: ten months of buffer after the end-2026 target.

Why Impact 3 Threshold case first gas delayed past 31 Oct 2027.

The other facts on file (1)
  • Herat governor expected commissioning within two months; 10 Aug memorandum sets no price or volume; distribution network still to be built; capacity 33 bcm a year [3] (27 Aug 2026)

Where it sits

Exhibit R-1 · Map

Where this risk sits

Size shows Impact. Colour shows the Likelihood band. The two scores are never combined.

TAPI gas does not reach Herat by end-October 2027. Impact 3 of 10, Low. Likelihood 4 of 10, Elevated.
  • Low 1–3
  • Elevated 4–6
  • High 7–8
  • Severe 9–10
  • Bigger circle: higher Impact
  • Solid ring: under way
  • Red ring: highest Impact on this map
  • Where it starts
  • Who it reaches

The risk on this map

  1. TAPI gas does not reach Herat by end-October 2027Impact 3 of 10, Low. Likelihood 4 of 10, Elevated. · Turkmenistan
SourceStrature world-risk cards. Cards reviewed 1 Nov 2026. Map: Natural Earth 1:110m, Equal Earth projection. Country names imply no position on sovereignty.
Exhibit R-1 · TURKMENISTAN · strature.net

How it spreads

If

By 31 Oct 2027, no Turkmen gas has flowed through the TAPI pipeline to Herat, as stated by the Turkmen or Afghan government.

Not under way

Channels 4 on the card

  1. CanadaNo Canadian loss sourced.
  2. Turkmen exportsHerat would be Turkmenistan's first TAPI sale; most gas now goes to China [2][3].
  3. Herat's energyGas meant for industry, power plants and households [3].
  4. The southern legsAfghanistan's TAPI office says the leg towards Kandahar needs more investment [1]; a slip would weaken that case (Strature's view).

Goods 1

  • Natural gas

Sectors 1

  • Energy and pipelines

Countries 2

  • Turkmenistan primary
  • Afghanistan

Who is exposed

Countries
Turkmenistan, Afghanistan
Sectors
Energy and pipelines
Goods
Natural gas

Three scenarios and their signposts

  1. S1

    First gas in 2027

    Commissioning in early 2027 and a sales contract follow.

  2. S2

    Commissioned, no sales

    The pipe is filled but no contract or network exists.

  3. S3

    Security stop

    Fighting or funding gaps halt work.

The signposts of each scenario
PathSignpost
S1A signed price and volume
S2No distribution tender in Herat
S3Works suspended near Herat

No probability is given for the three paths.

Dates to watch

Calendar

The dates to watch

A dot is a day, a bar a month or a year; a hollow mark is tentative. The line marks today.

  1. Dec 2026 Target to commission the Herat section [1] Tentative · Outside event
  2. 31 Oct 2027 End of the scored window [1] Declared · Strature date

    Remind me

Sign in, with alerts on, for an email 7 days and 1 day before.

SourceStrature world-risk card; the dates cite the sources below.
Exhibit R-3 · TURKMENISTAN · strature.net

The other side

First gas in Herat would give Turkmenistan a second export route and Afghanistan its first imported pipeline gas (Strature's view).

Connected in Strature

Sources

3 sources, numbered as the text cites them

  1. TAPI Pipeline segment to Herat is nearly 80% complete, Turkmenistan says. News Central Asia (nCa) · 22 Oct 2026 · News · confidence medium · retrieved 1 Nov 2026
  2. Turkmenistan making moves to diversify energy exports. Eurasianet via Eurasia Review · 18 Oct 2026 · News · confidence medium · retrieved 1 Nov 2026
  3. TAPI pipeline moves closer to first gas sales in Afghanistan. The Times of Central Asia · 9 Sep 2026 · News · confidence medium · retrieved 1 Nov 2026

Reviewed 1 Nov 2026 · version 1 · last change: first review · All risks