World risk · Energy and resources

Panama authorises a restart of the closed Donoso copper mine

The test Between 3 Nov 2026 and 3 Nov 2027, Panama's government issues a formal decision (decree, resolution or signed agreement) authorising the mine in Donoso to resume mining and processing of newly mined ore, beyond the treatment of stockpiled material.

Not under way · Confidence: medium · Reviewed 3 Nov 2026 · Scores from 1 to 10

This page answers: What could happen, how it is scored, and who is exposed?

Using this page
  1. Read the two scores: Likelihood and Impact are kept apart.
  2. Check what is happening, each fact with its source.
  3. Use the calendar for the dates to watch.

Follow this riskSign in to follow; one weekly email if you ask for it.

Likelihood
5Elevated steady this month
Impact
4Elevated steady this month
Breadth4
Depth2
Duration7
Hard to substitute4
Canada pointNot added0

Impact is the average of the four parts, rounded, plus one point when Canada is directly hit on two or more channels, up to 10.

Two separate scales from 1 to 10. Strature never multiplies or merges them.

Why it matters

Panama's large copper mine in Donoso has been shut since the Supreme Court struck down its contract law on 28 Nov 2023. A government audit found most environmental commitments met, and ministers are preparing a recommendation. Environmental groups reject the audit; no decision is due before the end of 2026.

Why Likelihood 5 Pushes: government intent, fiscal need, authorised talks with the operator. Brakes: the 2023 court ruling, slipping dates, organised environmental opposition. Named sources on each side: an open contest.

Why Impact 4 Estimate (the decision moves no sized sum in the window). A restart is a gain.

The other facts on file (5)
  • The Supreme Court declared the contract law unconstitutional on 28 Nov 2023, after weeks of street protests [1] (9 Sep 2026)
  • Audit delivered 19 Jun 2026; the environment minister said the mine met 87.64% of 370 auditable commitments, with nine operational failures; a recommendation should reach the president before the end of 2026 [2] (14 Jul 2026)
  • President Mulino said a reopening would carry no concession contract; the mine was about 5% of GDP and 75% of exports [3] (19 Jun 2026)
  • CIAM's Lilian Guevara said the audit is neither independent nor comprehensive (Strature's translation), and the Mesa Técnica para el Cierre de Minas asked that it not be accepted as comprehensive; the government has authorised talks with the operator and the processing of 38 million tonnes of rock already extracted [4] (29 Jul 2026)
  • The government says no mine decision will come before year-end; royalties could exceed 0.4% of GDP; an adverse arbitration outcome could cost up to 19 points of GDP [1] (9 Sep 2026)

Where it sits

Panama CanalCOLOMBIAHONDURASNICARAGUAPANAMACOSTA RICA11. Panama authorises a restart of the closed Donoso copper mine: Elevated impact · possible (Cobre Panamá mine, Donoso)1 Panama authorisesa restart of the closedDonoso copper mineElevated impact · possible · Cobre Panamá mine, DonosoPANAMA RESTARTS COPPER MINE0500 kmat 9°NMap data: Natural Earth (public domain).
Panama CanalCOLOMBIAHONDURASPANAMA11. Panama authorises a restart of the closed Donoso copper mine: Elevated impact · possible (Cobre Panamá mine, Donoso)1 Panama restartscopper minePANAMA RESTARTS COPPER MINE0500 kmat 9°NMap data: Natural Earth (public domain).

How it spreads

Sample, no data on file. No cited flows by country on file for this risk.

If

Between 3 Nov 2026 and 3 Nov 2027, Panama's government issues a formal decision (decree, resolution or signed agreement) authorising the mine in Donoso to resume mining and processing of newly mined ore, beyond the treatment of stockpiled material.

Not under way

Channels 4 on the card

  1. CanadaThe operator is Canadian [3]; no Canadian loss sourced (a restart is a gain).
  2. Public financesA restart could add more than 0.4% of GDP in royalties [1]; the mine was about 5% of GDP and 75% of exports before closure [3].
  3. ArbitrationClaims of about US$27bn are suspended pending the decision [2]; an adverse outcome could cost up to 19 points of GDP [1].
  4. ProtestsWeeks of street protests preceded the 2023 closure [1]; groups still want the mine kept closed [2][4].

Goods 1

  • Copper

Sectors 1

  • Mining and metals

Countries 2

Who is exposed

No figure on file: Panama, Canada.

Sectors
Mining and metals, Government bonds
Goods
Copper
Companies
First Quantum Minerals

Three scenarios and their signposts

  1. S1

    Restart authorised

    The ministers recommend reopening and a decree or agreement follows in 2027.

  2. S2

    Stockpile only

    Treatment of extracted material continues and the restart decision slips.

  3. S3

    Closed for good

    The government opts for a closure plan.

The signposts of each scenario
PathSignpost
S1The ministerial recommendation delivered
S2No recommendation by end-2026
S3Arbitration claims revived

No probability is given for the three paths.

Dates to watch

Calendar

The dates to watch

A dot is a day, a bar a month or a year; a hollow mark is tentative. The line marks today.

  1. Dec 2026 Ministerial recommendation due before the end of 2026 [2] Tentative · Window
  2. 3 Nov 2027 End of the scored window [1] Declared · Strature date

    Remind me

Sign in, with alerts on, for an email 7 days and 1 day before.

SourceStrature world-risk card; the dates cite the sources below.
Exhibit R-3 · PANAMA · strature.net

The other side

The government cites 40,800 jobs lost and more than US$6.3bn of output forgone since closure [2]; a restart would bring royalties and jobs back [1][2].

Connected in Strature

Sources

4 sources, numbered as the text cites them

  1. Panama fiscal deficit, Moody's and investment grade 2026. The Rio Times · 9 Sep 2026 · News · confidence medium · retrieved 3 Nov 2026
  2. ¿Qué pasará con la mina Cobre Panamá? La definición llegará antes de fin de año. Revista EyN (EFE) · 14 Jul 2026 · News · confidence medium · retrieved 3 Nov 2026
  3. Panamá da un paso hacia la reapertura de su mayor mina de cobre tras auditoría favorable. El Espectador (AFP) · 19 Jun 2026 · News · confidence medium · retrieved 3 Nov 2026
  4. Ambientalistas denuncian invalidez de auditoría a mina cerrada en Panamá por incongruencia. ABC Color (EFE) · 29 Jul 2026 · News · confidence medium · retrieved 3 Nov 2026

Reviewed 3 Nov 2026 · version 1 · last change: first review · All risks